Clean room wall panels factory in China: Settling colony count and plankton determination requirements: at the same time of each experiment, count the settling colony of microorganisms in the operating room and laminar flow table, record the results in the user log, and record the original data of the experimental environment in the experiment report. Disinfection requirements: Every week and every operation in the sterile room, the operating table and the dead corners should be wiped with appropriate disinfectant. The specific method is to use sterile gauze impregnation disinfection solution to clean the entire inner surface of the super clean bench, and aseptic room, flow of people, logistics, buffer room floor, transfer window, door handle. Cleaning and disinfection procedures should be from the inside out, from high clean areas to low clean areas. Gradually exit the clean area. Then turn on the aseptic air filter and UV lamp for 1-2h sterilization to kill the remaining microorganisms. At the end of each operation, wipe the workbench with the above disinfection solution, remove indoor moisture, and sterilize with UV lamp for 30min. See more information on pharmaceutical turnkey projects.
For the tuyere equipped with filter, the auxiliary air duct can be selected according to the tuyere form, that is, the straight pipe section with the same section as the tuyere and the length equal to twice the side length of the tuyere is made of hard plate, which is connected to the outside of the filter tuyere. The measuring points are evenly arranged on the outlet plane of the auxiliary air duct according to the minimum number of measuring points, and the wind speed of each point is measured with a hot ball anemometer. The air volume is determined by multiplying the average wind speed at the section of the air outlet by the net section area of the air outlet.
High quality clean room in pharmaceutical industry wholesale manufacturer and supplier: Generally, the air flow distribution point on the surface of the operating table or production equipment should be located at 2/3 of the distance between the clean room space and the partition wall, so that when the operator is working, the air flow can flow from the inside of the process area to the operation area, and the The dust is taken away; if the distribution point is arranged in front of the process area, it will become an improper airflow distribution. At this time, most of the air flow will flow to the process area, and the dust caused by the operator’s operation will be brought to the back of the equipment. As a result, the platform will be polluted, and the yield rate is bound to decrease.
The frame of the clean shed can be generally divided into three types: stainless steel square pass, varnished iron square pass and industrial aluminum profiles. The top and the top can be made of stainless steel steel plate, lacquered cold plastic steel plate, anti-static mesh curtain and acrylic plexiglass and other materials. Anti-static mesh curtains or plexiglass are generally used around, and FFU clean air supply units are used in the air supply unit.
Airflow is the most important factor in controlling cleanliness and temperature and humidity, and it also has some influence on noise. Therefore, the wind speed measurement is the first step in the clean room test. The purpose of the wind speed measurement is to confirm that the air flow sent by the filter meets the design specifications, and the second is to confirm the uniformity of the air flow. In some occasions, due to site restrictions, the indoor ventilation volume must also be converted by multiplying the wind speed by the outlet area. Find extra info at https://www.sz-pharma.com/.
The filling speed of the capsule filling machine is fast, and the size difference of the capsule filling machine is small. It integrates the powder capsule shell finishing, capsule cap finishing and capsule package, which is compact and convenient. In addition, the capsule filling machine has many advantages, such as fast arrangement speed, high efficiency, simple operation, convenient maintenance and low power consumption. It is the preferred capsule filling (filling) machine for pharmaceutical factories, health product factories, hospital preparation rooms, etc
Efficiency of Equipment: Some equipment, such as electronics and mechanical components, require specific humidity levels to function correctly. Maintaining the right humidity levels in clean rooms ensures optimal performance and longevity of these critical pieces of equipment. How to Maintain Optimal Humidity Levels in Clean Rooms? To maintain optimal humidity levels in clean rooms, consider the following steps: Install a Dehumidifier: A dehumidifier is an essential tool for maintaining proper humidity levels in clean rooms. It removes excess moisture from the air, keeping humidity levels within the desired range. Choose a dehumidifier based on the size of your clean room and the relative humidity requirements you need to meet.
Mainly control the pollution of air dust particles and organisms (bacteria) to working objects, and maintain a negative pressure with the atmosphere inside. Pharma cleanroom project It is suitable for precision machinery industry, electronics industry, aerospace industry, high-purity chemical industry, atomic energy industry, optomagnetic product industry, LCD, computer hard disk; pharmaceutical industry, hospital, operating room, sterile ward, food, cosmetics, beverage products Animal laboratory, physical and chemical laboratory, blood station, etc. More cases check our cleanroom project page.